Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 02, 2022     Baggage door assembly - (3.2 hours)       Category: Baggage Door
1. Trimmed the lower edge of the skin spacer piece that sits under the outer baggage door skin.
2. Fabricated the 2 lock rods.
3. Test-fit the rods to the lock arm.
4. Assembled, drilled and clecoed the outer baggage door skin, the two door ribs, and the outboard angle strip/lock reinforcement.
5. Just for fun, I laid the newly-created door frame on the fuselage. It appeared to fit really nicely (but I know there's a lot of work ahead to make it fit well!).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.